14 July 2020

Chronology of Wind Turbines in the Sandhills and the R-Project

Compilation by James E. Ducey, Valentine, Nebraska. Initially prepared February 5, 2018; second version February 13th. Updated May 21, 2018, August 3rd, August 24th and then in late October. Also August and early December, 2019. Then June 2020.
This chronology conveys actions associated with wind turbine facilities and powerlines within the sand hill region during the past 20 years as developers have planned for turbine facilities and industrial powerlines as wanted by private companies, utility companies and regional power agencies. Some industrial wind turbine facilities have come to fruition, while others have not. The three primary turbine facilities currently are the Ainsworth Wind Facility, the Broken Bow turbines, and the Grande Prairie facility in northern Holt county. Additional turbine facilities occur further east at the edge of the hills, notably in Antelope county. Many actions have been taken by multiple people in regards to this issue. This chronology indicates some of the more significant and known actions. This compilation is not comprehensive but indicative.

1994

The Nebraska Public Power District (NPPD) board of directors agrees to provide funds for a pilot wind turbine project south of Ainsworth. Studies for the project were conducted in cooperation with KBR Rural Public Power, according to press reports.

1998

The NPPD board of directors agreed to contribute $652,000 for a pilot wind turbine facility near Ainsworth. Studies for the Ikenburg Hill project were conducted in cooperation with KBR Rural Public Power District at Ainsworth and Battelle Pacific Northwest Laboratories (March 19; Holt County Independent). The leased property for the project would comprise 8,300 acres.

2005

A newspaper article issued March 2, indicated that "Blades, Birds to Coexist on Wind Farm" at the Ainsworth wind facility, situated in the midst of the Central Flyway of significant species of migratory birds (March 2, 2005; Omaha World-Herald).

The 36-turbine Ainsworth Wind Facility south of Ainsworth as established by the Nebraska Public Power District became operational on September 15. This facility was indicated as being the "state's largest wind generation resource" The project cost approximately $2 million, with money also coming from a Department of Energy grant and from other power districts across Nebraska (March 19, 1998; Holt County Independent).

2007

Midwest Wind Energy LLC, confirmed that a 100-megawatt wind farm is in the works for Holt County. The project would cost $160 million (March 10, 2007; Omaha World-Herald). The company headquarters were in Chicago, IL. Midwest has formed Holt County Wind LLC to oversee the Nebraska wind farm.

Research was completed by people associated with a Cornell University research in 1996-1997, as hired by NPPD. The research project cost was $600,000, according to NPPD staff. Biologists of the Nebraska Game and Parks Commission assisted in determining prairie grouse lek locations. Results were issued in February, with an estimate that annual take would be 148 birds per year, as derived from a 4.10 bird take for each of the 36 turbines (December 2, 2007; Wildbirds Broadcasting). NPPD estimated that the annual take would be 2.49 bird fatalities per megawatt. There were 23 bird species documented as fatalities, with 41 species known to occur at the site of the facility. There were eight leks of either the Greater Prairie Chicken or Sharp-tailed Grouse known to be present at the site.

2009

Article issued on how Maxine and Ed Wehling fought the placement of a wind turbine facility on the West Table in western Custer county (April 3; Wildbirds Broadcasting). A MET tower had been installed by BP Energy but based primarily due to the ongoing occurrence of the Whooping Crane at playa wetlands in the area, the project was stopped. The couple documented the wetlands and their scattered distribution.
The U.S. Department of Agriculture Rural Development office assisted Coble and Sons Ranch with a $14,725 grant for five Skystream wind turbines through a Renewable Energy/Energy Efficiency program (April 5, 2009; North Platte Bulletin).

During March 2009, a representative of British Petroleum Energy met with the Cherry County Planning Board to discuss wind energy development within the county.

2010

In January the Cherry County Board of Commissioners appointed individuals to evaluate the potential for wind energy development. The chairman of the Zoning Board also met with a representative of BP to discuss regulations.

On March 30, the county commissioners passed a motion to form a Cherry county wind energy committee.

On December 8, Cherry commissioner Jerry Adamson made a motion to appoint six men to the Cherry County Wind Advisory Committee. The motion carried.

On December 14, the Cherry County wind committee met at the county courthouse.

2011

The Cherry County wind committee met on February 8 with Pat Pope of NPPD. Pope provided directions to work with the Southwest Power Pool to facilitate transmission lines within the county that could be used to export electricity generated by turbine facilities.
UNL researchers initiate research with a primary objective to "assess behavioral, population, and/or wildlife community impacts of wind farm siting decisions with the aim of facilitating siting decisions that simultaneously maximize energy potential and ecological resilience," (March 17, 2011; Grant County News). "We want to develop indices to measures the long-term dynamics" related to wind turbine siting, Fontaine said, "and make decisions that are beneficial to everyone. We need to think about long-term implications before decisions are made."

Members of the Cherry County wind committee met on April 22 with three representatives from NPPD to discuss the development of wind turbine projects within the county. Four topics of particular discussion were: 1) indicate the potential for wind energy conversion systems; 2) need for transmission lines; 3) environmental aspects; and, 4) community support (from history of Cherry County Wind).

Non-profit Cherry County Wind LLC established in July. An initial meeting was held August 9. Records indicate that NPPD would be willing to move a proposed transmission line northward so it would be available to transport electricity from any Wind Energy Conversion System (WECS) within the county. During August, the group was actively working on "two areas of concern which include transmission lines and landowner association." Efforts to work with the SPP and NPPD were indicated as continuing to be underway in October.

Article issued October 27 indicating details for a proposed wind turbine development as submitted to the FAA by Eurus Energy America Corporation, of San Diego, California, for more than 50 wind turbines proposed for northeast Arthur county. There were two proposed key areas of development, and both of them would encompass about 37,000 acres. Hilltops were indicated places of placement near Baldy Valley and above Baldy Valley. Details were determined from application 201-WTE-65-OE, as available at the Federal Aviation Authority website (October 27, 2011; Grant County News). This is in the big hill country of the southern sandhills.

At a conference in Kearney on November 15-16, George Johnson of Cherry County Wind LLC gave a presentation on facilitating turbine facility development in the sand hills region, indicating that the group was started after the Cherry County commissioners asked several people to "develop policies to become the leading county in Nebraska for wind energy production." Committee goals were indicated as: "Strengthening and broadening the tax base; Being mindful of our wildlife resources; providing high quality employment; maintaining our quality of life" and "growing our economy."

In November the Cherry County Wind Advisory Committee announced that after 20 months of effort on "refining the plan for wind energy development" the Cherry County Wind Energy Association was incorporated and residents were asked to attend an informational meeting (November 16, 2011; Valentine Midland News). The first meeting was November 22 at Valentine and 70 people attended; then the next evening at Mullen with 60-70 people attending. The story also indicated the group had been working with NPPD, Omaha Public Power District (OPPD), Lincoln Electric System (LES), and the Southwest Power Pool "advocating for a new transmission line that will cross Cherry county," Matt Coble said. The association were "actively planning" a large wind development project in the county. The deadline for landowners to sign-up was December 15, with a $100 fee to become a member of the association (History of Cherry County Wind). Participants also indicated property where wind turbine facilities could be placed, via a contractual agreement.

2012

The Southwest Power Pool provided construction approval on January 31 for the R-Project, a 220 mile industrial powerline that would extend from the Gerald Gentleman Power station by Sutherland to the Western Area Power Administration 345,000 volt transmission line at the southeast corner of Holt county. The SPP has at least utility members in Arkansas, Colorado, Kansas, Missouri, Nebraska (Including NPPD, OPPD and LES), New Mexico, Oklahoma and Texas utility companies.

In response to R-Project approval the following comments were made by George Johnson: "Approval of the r-plan is the important beginning of a unique and tremendous opportunity for economic development in Cherry County and across the State. We all know the wind blows here and that we can harness the energy. The challenge has been finding a way to ship the energy out. It's like Wyoming coal without railroads. With no way to export the energy, it's not worth much. The r-plan is the new railroad, which transmits electricity rather than carrying coal. We're on the verge of a very exciting time." Jerry Adamson said: "This project could possibly have the biggest positive impact on Cherry County as anything we've seen since the railroad system was built," according to a newspaper article.

2013

During January NPPD held six open houses were held on the R-Project. They were the first of three rounds of open houses, which would be followed by a public hearings along the route of the proposed powerline.

Approval given by Planning and Zoning Board of Cherry county to Bluestem Sandhills LLC to place 60 foot meteorological towers in Cherry county, that would be placed on the Pullman ranch (two), Rothleutner Ranch near Kilgore, and Bureau of Educational Lands and Funds property on the southern edge of the county along Highway 83 upon BELF land owned by the public, based upon a decision which involved no public comment. This initial intent for the towers was specifically reduced to fit within the confines of properties where industrial wild facilities could be built on participant properties.

2014

Details indicated on proposed wind turbine project in southeast Cherry county, north of Thedford, (May 15 article on Wildbirds Broadcasting). The proposal would comprise 147 turbines as derived from online Federal Aviation Authority records, as individually reviewed and evaluated. Information on turbine locations was later redacted, i.e., removed from the FAA website.

The ribbon-cutting ceremony for a single wind turbine built westerly of Valentine occurred on September 10. A power purchase agreement had been signed with the City of Valentine "in an effort to reduce overall electric rates for city customers" (History of Cherry County Wind). Subsequent details indicated the actual expense of this turbine to the Valentine power gird power purchasers.

On October 10, the Nebraska Power Review Board approves the construction of the R-Project (Omaha World-Herald article). The vote was 5-0 for approval; the article indicates there were six hours of testimony by project opponents.

Eight public hearings held by NPPD during November concerning the 225 mile R-Project industrial powerline, which had a projected cost of $350 million. The Southwest Power Pool would pay 90% of the project cost.

2015

Citizens gathered on Main Street prior to the July 19 public meeting at Valentine.

Final route alignment announce for the 345 kilovolt R-Project industrial powerline in late-January by NPPD. Requests for right-of-way entry were sent to 270 property owners along the proposed route at the time (January 26, 2015; Omaha World-Herald). NPPD expected to start acquiring 200-foot-wide easements in September in order to get construction underway.

U.S. Fish and Wildlife Service requested that the $361 million R-Project powerline be moved out of the Sandhills with NPPD responding that the route is final and it will not be changed (February 19, 2015; Omaha World-Herald).

2016

April 18 application by BSH Kilgore, LLC for a Conditional Use Permit to place 30 wind turbines south of Kilgore.

On April 19, a lawsuit was filed by Brush Creek Ranch LLC against NPPD challenging the right of the power company to access ranch property; hearing on motion held August 12, with the ranch losing the decision, and thus having to allow the utility company to access their property.

Letter to editor by LeRoy and Carolyn Semin about visit by George Johnson to their ranch on April 19th (May 11, 2016; Valentine Midland News). Then a May 18 letter to editor by Matt Coble about wind turbine development, as representing Cherry County Wind LLC in the same newspaper.

Cherry County Planning and Zoning Commission decision on May 23 that approval of a CUP for 30 turbines at a Kilgore wind turbine facility be postponed until a determination was made on whether the Nebraska Game and Parks Commission, an adjacent landowner, had been properly informed.

Special meeting and public hearing held by Cherry county Planning and Zoning on July 19, 2016 regarding CUP 01-16 to allow the construction of a Wind Energy Conversion System development near Kilgore. Motion made to disapprove request was made; motion passed with cited reasons being that there was "no professional engineering stamp for the entire project" and also, because of a "large discrepancy in the decommissioning plan for costs," according to meeting minutes. Prior to the meeting being moved to the Valentine High School. Chairman George Johnson resigned due to an obvious conflict of interest. Opponents of wind turbines gathered to indicate their opposition to turbines, prior to the meeting where they conveyed their position on the public sidewalk of the county office building on north Main Street.

Preserve the Sandhills LLC publicly presented on August 4 a letter and brochure issued asking for public involvement and opposition to wind turbines. This occurred very soon after the group was formed by ranch wives in Cherry and Thomas counties.

Informational booth by Save the Sandhills and Preserve the Sandhills members at the Cherry county fair on Aug 12.

NPPD issues a statement from an agency spokes-person that a power transmission line (T Line) will not be built through Grant county, according to August 15 report by KNOP news of North Platte.

In August, a large Preserve the Sandhills banner prominently placed by Mike Young in the front window of Young's Western Wear on Main Street, Valentine. A member of Cherry County Wind states that placement of the sign would mean the loss of more than 50 customers for the business.

Informational meeting on wind energy development held at the Winter Building at Hyannis on August 15; a response to this meeting was issued as District 43 news by senator Al Davis on August 24 in regional newspapers.

Public letter issued August 22 by Cherry County Wind LLC promoting turbine development. Several letters to the editor on this topic were subsequently published in regional newspapers.

A flyer with the claim "A Brighter Future is on Our Horizon" was sent by area residents by Cherry County Wind LLC via postal mail, as received on September 29 at a Valentine mail box.

Franz Muller, Cody, letter to the editor published October 5 in the Valentine newspaper questioning the presentation on the "Comment Show" program of KVSH due to undisclosed conflict of interest due to a "bias" by commenters on September 16. Also indicated was that state senator Ken Schlitz of Ogallala provided promotional facts and figures supportive of wind turbine development. KVSH radio announced Mike Burge is secretary for Cherry County Wind LLC.

Public hearing held by Cherry county commissioners on October 11 on proposed changes to zoning regulations.

The October 26 hearing by the county commissioners on the BSH Kilgore POSTPONED due to failure to provide proper notification of meeting, as required by regulations; new date scheduled for November 16.

Forum on renewable energy sponsored by Center for Rural Affairs on October 27 at the Peppermill restaurant, at Valentine.

Grande Prairie wind turbine facility in Holt county, owned by Berkshire Hathaway Energy, became operational during October, with 200 turbines northeast of O'Neill, Nebr. Many of the turbines were placed within an extensive area with center-pivots that water cropland.

Soup supper and fund-raising auction held November 15 by Preserve the Sandhills at the Cowpoke in Thedford.

Letter to editor by Sheldon Otto in the November 30 O'Neill newspaper states: "Warren Buffet said it and the president of Berkshire Hathaway Energy acknowledged it at a zoning meeting. 'There would be no wind turbines if it weren't for the tax incentives.'"

Public hearing by Cherry county commissioners on CUP 01-16 held December 7, at the Valentine High School, with more than 100 people present; the hearing had been POSTPONED twice due to an improper notification notice; several opponents to wind turbines gathered at the court house prior to the meeting, according to comments heard at the hearing.

On December 19 the application for CUP 01-16 (Kilgore project) was denied by Cherry County commissioners Mark Adamson and Tanya Storer; commissioner Van Winkle did not attend. A prominent problem was the newspaper-reported revision in the number of turbines which might be constructed at the project site - they would be taller but fewer in number.

On December 27 the Cherry county commissioners enacted a six-month suspension was enacted on wind turbines CUP applications within the county; with Planning and Zoning tasked to prepare a report on three items: 1) health effects, 2) fire suppression, and 3) property values.

2017

Testimony given at Zoning Board meeting on January 3 given by Keith and Vicki May about the extent of noise at their residence 1.3 miles from the nearest turbine of the Grande Prairie wind facility north of O'Neill, which extends across a reported 50,000 acres.

Construction was expected to have been started on the R-Project in January, according to NPPD's initial expectations.

Public hearing held March 1 on Legislative Bill 504 in the state capitol at Lincoln by the Natural Resources Committee, of the Nebraska legislature. Numerous sandhill residents attended and presented testimony. During the highway trip back to the heart of the sandhills. It was a situation where "boots versus suits" as indicative of visual comparison of garb between power industry representatives and ranch county citizens that presented testimony at the hearing.

Advertisement by Preserve the Sandhills printed on March 22nd advocating that turbines be banned in the sandhills, and stating a "call to action" (Valentine Midlands News).

Bird surveys done by J.E. Ducey on April 12 and May 10 along the corridor of the proposed R-Project powerline with detailed reports issued on Wildbirds Broadcasting blog, notably for locales in southern Holt county. Effort funded by Preserve the Sandhills LLC.

Article issued by J.E. Ducey regarding how a University of Nebraska-Lincoln study on the behavior of Greater Prairie-Chicken at the Ainsworth Wind Turbine Facility was found to be deficient (April 24, Wildbirds Broadcasting blog).

At the May 2 meeting of the Zoning Board, whiteboard list of items of concern/consideration was presented at the monthly meeting by a member of the board; comments given by Ducey on deficient UNL study on the effects of wind turbines on Greater Prairie-Chicken.

Document dated May 10 submitted to the U.S. Army Corps of Engineers asking for a "nationwide permit" that would allow the minimal fill of wetlands during construction of the r-project. The claim was made that less than 0.50 acres of Waters of the United States would be filled.

A draft environmental impact statement for the r-project issued by the U.S. Fish and Wildlife Service in May. A draft habitat conservation plan became available at the same time.

Initial details presented on June 6 on Planning Commission Review of Cherry County Commissioner request for the group to address specific items of concern as requested by commissioners.

Letter dated July 10 submitted by Carolyn Semin asking the Cherry county Zoning Board for clarification on items concerning wind turbines as discussed at their most recent meeting.

At July 21 meeting of the Zoning board, Jim Ducey commented on obvious violations of Open Meetings Act, notably not allowing public comment, not providing a copy of distributed material to the public, and concerns about not having a sign-in sheet, which is a courtesy, not a legal requirement; attendee Ducey indicated that a civil suit could be subsequently filed.

On July 17 Robert Harms of the U.S. Fish and Wildlife Service was not allowed to attend a private meeting at Thedford because of complaints made by NPPD. Meeting occurred anyway. NPPD representatives were asked to leave and they eventually left after four requests. People subsequently arriving saw pictures being taken of cars and their license plates.

A July 25 letter to editor by Dr. Brent Steffen in Kearney Hub and other regional newspapers concerning "government by the people" in regards to July 17 meeting action and the R-Project.

On August 2, senator Dan Hughes (Nebraska Legislature District 44) comments supportive of R-Project indicating it was requested by Southwest Power Pool, published in the McCook newspaper.

On August 18, Dr. Brent L. Steffen issued additional comments in the McCook newspaper about how Sen. Hughes is misinformed on the R-Project.

A multipage document titled "Sandhills Challenges, Sandhills Solutions" received via postal mail on August 22 as sent by Cherry County Wind LLC.

Meeting scheduled by U.S. Fish and Wildlife Service during the month at Thedford was summarily POSTPONED.

Nebraska senator Tom Brewer (district 43) met with representatives of NPPD and OPPD on August 23. At meeting, NPPD indicated they had 71% of the landowner easements needed to construct the r-project; also that the company did not care if wind turbines were ever built because of the availability of the r-project transmission line.

Public hearing on LR 125 held at Lincoln on September 22 (news accounts in Lincoln and Omaha newspapers).

Letter to editor by Brent Steffen about the need for a world-class attraction in the sandhills, and sarcastically referring to wind turbines (September 23, 2017; Kearney Hub).

October 6 version of weekly comment column issued in different newspaper by senator Tom Brewer stating that wind energy is not "Nebraska Nice" and which included the verbiage that "wind energy is a scam that hurts people and animals, wastes billions in tax dollars and isn't green by any definition of the term."

October 7 letter to editor by Jim Foral in Lincoln newspaper on how sand hill residents are right to fight the r-project.
On October 11 numerous landowners met at the Thedford fairgrounds despite previously scheduled public hearing on the R-Project by the U.S. Fish and Wildlife Service being POSTPONED until October 25.

An October 17, letter to editor in North Platte newspaper by Dr. Steffen on how "R-Project exemplifies overreach".

On October 19 Preserve the Sandhills and Save the Sandhills issued a ten page educational insert in regional publications.

During late October an updated abstract/memorandum of agreement between Cherry County Wind LLC and involved property owners were filed as legal documents in the county deeds office. The term of the agreement was indicated as forty years.

U.S. Fish and Wildlife Service held a public hearing on October 25 at Thedford in regard to the R-Project, with about one hundred people present with testimony restricted to three minutes and the meeting having been ended after two hours. An additional hearing was held at Burwell.

Senator Tom Brewer wrote weekly update column dated October 27, after attending the FWS hearing at Thedford on the r-project.
Thomas Kent, chief operating officer of NPPD, claimed Steffen comments as previously published were not accurate in a letter to the editor as issued October 28 (North Platte Telegraph).

Capitol view column by J.L. Schmidt and Paul Fell political satire cartoon on the R-Project issued November 1 in regional newspapers.

Close of public comment period on November 7 for draft EIS regarding the R-Project, after an extended comment period because of requests by concerned residents, citizens and representatives.

On November 7 the Planning and Zoning Commission approved changes to the zoning regulations regarding setback distance, noise levels and turbine blade flicker with a vote of 6-2. Recommendations submitted to county commissioners.

Private meeting held November 18 at Valentine to discuss possible actions to oppose wind turbines in the county.

Presentation given at Cherry county commissioner meeting on November 28 meeting on a peer-reviewed report on "infrasound from wind turbines" as discussed by Ryan T. Callahan.

Privately issued on December 1 was a revised list of land-owners that have a memorandum of agreement to allow wind turbine development on their property, as determined by county public records.

During the month, a revised indication of wind turbine placement near Kilgore became available online as associated with the Federal Aviation Authority.

County commissioner requested zoning board report on three topics presented by Albert Ericksen to the county commissioners on December 12.

2018

Public hearing on changes in zoning regulations scheduled by county commissioners for January 17; meeting held then hearing date postponed to February 7 due to failure to inform municipalities (i.e., Wood Lake, Kilgore, Cody, Merriman; zoning regulations section 11.02.03) as conveyed by Carolyn Semin during meeting on January 9.

Letter to editor on January 10 by Bob Stetter conveying the need for a "SOS" or Save Our Sandhills action (Valentine Midland News).

Full-page advertisement by Preserve the Sandhills urging that people attend the public hearing on proposed changes in the zoning regulations; published in the regional Pioneer Advertiser et al.

Private meeting held January 24 to discuss actions to ban turbines within Cherry county, with effort initiated to repeal and replace sections of the zoning regulations.

Initial digital map of Cherry County Wind investor stake-holders provided on January 27, with additional key details indicated. Investor lands, et al., derived from official county records and other sources. Map subsequently revised in March.

Tony Baker, the legislative aide for Senator Tom Brewer stated during a radio interview on January 30 that LB 1054 might help ensure that "wind turbine developers will be better neighbors." Than subsequently he stated "put wind turbines away from people" as personally heard on Twister radio in the morning.

Advertisement in January 31 issue indicating numerous people - including area residents and others - opposed to development of wind turbine facilities within the sandhills region (Valentine Midland News).

Public hearing held on legislative bill 1054 at the Nebraska Legislature at Lincoln on February 1. The legislation would remove wind energy developments from the definition as a privately developed renewable energy facility and require that the public be allowed to comment at hearings of the Nebraska Power Review Board. The bill effort failed.

Commissioners hearing held February 7 at Valentine High School regarding changes proposed for the Cherry county zoning regulations, regarding most essentially setback distances, noise levels and turbine flicker. At least 150 people, as well as county officials were present at the Valentine High School. Testimony was presented by 44 individuals, with 30 of them in favor of the proposed changes as submitted by the Planning and Zoning Board. There were prominent comments made by both groups that were diametrically different, using disparate sources. The decision was 2-1 against acceptance of the recommendations (only Tonya Storer voted against the motion to reject the recommendations), since there was no second for the motion, so no group vote actually occurred.

Application submitted to interim zoning administrator during mid-afternoon on February 8 to the interim county zoning administrator requesting that most of the section 613 regulations be repealed, and then replaced with language that would prohibit the placement of commercial/industrial wind energy conversion systems; also to limit agricultural district towers (windmills, wind chargers, or wind turbine) to less than 80 feet. The request included more than 300 signatures of land-owners within Cherry county. The agenda item was not addressed at the March meeting since the meeting was cancelled due to weather. It was then not considered at the May meeting, being pushed back to the next regularly scheduled meeting.

On February 22, Gary Folk published a letter to the editor in the Grant County News indicating opposition to industrial wind turbines and that any wind energy development should be associated with smaller units suited to a ranch (also subsequently issued in the Valentine, North Platte and Omaha newspapers). Steve Moreland in his Soapweed Soliloquy column expressed that industrial wind turbines should not be built in the Sandhills.

Willard Hollopeter conveyed an opposition to industrial wind turbines and high-voltage powerlines during his morning Heritage Trail commentary on February 27, as spoken on KVSH radio, Valentine.

Request for a public referendum vote on wind turbines presented February 27 by Cleve Trimble to the county commissioners. The commissioners took no action (commissioner meeting minutes; article in the Grant County News).

Letter to editor on February 28 by Janet Parkhurst on the need for compromise on the wind turbine issue. Imposition of a limit of 300 words or less on any subsequent letters to the editor on this issue (Valentine Midland News).

The first installment of a four-part missive on wind turbines, regulations, and county official involvement was issued online by Carolyn Semin, a west Kilgore resident, on April 19th.

Public forum for candidates for Cherry county commissioner held at Valentine, on April 19th. Candidates James B. Ward and Michael C. Young both specifically indicated their opposition to having wind turbines built within the county. Also present were candidates Harold Osgood and Tanya Storer (article subsequently issued in the Grant County News).

Carolyn Semin presented details of her financial research findings at the April 24 county commissioner meeting. More than 60 residents were present. She indicated that county funds were spent to promote wind energy and industrial powerline development in Cherry county, totaling $13,188.04, notably in 2011. There were there subsequent speakers conveying their opinions and perspectives during the public comment period; most of them were opposed to industrial wind turbines and powerlines. A county resident planned to ask state officials to require an audit. Radio reporter Craig Andresen, commissioner Tanya Storer and Carolyn Semin spoke on this topic on the Twister radio stations the next morning, during the Free Speech Zone program.

During the public comment period at the May 8 meeting of the Cherry County commissioners, Carolyn Semin asked when the commissioners would address the use of county funds. According to rules of order, the motion tabled at the previous commissioner meeting should have been addressed. Jim Ducey asked than an independent audit be conducted to get a completely accurate indication of any and all amounts paid by the county in association with facilitating development of industrial wind turbines. The three commissioners eventually rejected any effort by them to account for the documented spending of public funds. Carolyn Semin responded June 12, 2018 to comments previously made by Van WInkle and DeNaeyer; none of the commissioners responded to her scathing commentary of 15 minutes. It should be noted that video recordings are made at the commissioner meetings, so her response was based upon the words said as derived from a video, not any actual written transcript.

At the June 5th meeting the Cherry county planning and zoning board set July 11 as the date for the public hearing regarding proposed changes to the county zoning regulations. There would be seven items considered and which are the same items rejected by the county commissioners in February.

Meeting held on June 19 at the Lincoln County Historical Museum to discuss aspects of the r-project. Based upon a list of attendees, it seemed to be a discussion of how the powerline would impact the setting where wagon ruts associated with mid-1800s pioneer caravans to the west continue to be obvious on the prairie landscape?

An article titled "wind turbines will change ecological dynamics in Sandhills, but could add economic incentive" as authored by Teresa Clark was published in the Tri-State Livestock News with a date of June 20 for the online version of the article. People quoted in the article included Carolyn Semin and Tony Baker.

Following the approval for the placement of 35 powerline locations south and easterly of Thedford by the Federal Aviation Administration, and article by Ducey indicating the threat for the use of eminent domain by NPPD was issued June 21 on the front-page of the Grant County News. The applications approved were apparently the first associated with the r-project.

On July 11 public hearings held by Cherry county planning and zoning in regards to seven proposed changes to the zoning regulations. Every proposed changed was approved by the zoning board, and which would then be submitted to the Cherry County Commissioners. At this meeting copies for the Conditional Use Permit permit for BSH Kilgore was provided to the county officials. Based upon details learned at the Aug 31 meeting of the county commissioners, the applicant provided the nicely bound, full-color copies of the 470 page document for each member of P&Z.

On July 19 a request was filed by William Weller, and the fee paid requesting that the definition for industrial use in the Cherry county zoning regulations be revised to include WECS facilities with turbines exceeding 100 feet of height above ground level be classified as an industrial use. The request included that a change be made so commercial/utility classification be revised to industrial throughout the regulations.

July 25: multiple anti-wind residents of the Platte valley and Sand Hills gathered at North Platte to convey their opposition to the R-Project. The majority of attendees were opposed to the industrial power-line project, according to reports. News articles were subsequent, including the North Platte Telegraph and Omaha World-Herald. The meeting started at 6 p.m. and was scheduled to end at 9 p.m. but continued until just after 11 p.m.

The weekly legislative update by Sen. Tom Brewer discussed the North Platte meeting and distinctly conveyed his opposition to the r-project and disgust with NPPD. This indicative missive was published in multiple regional newspapers.

A July 31 editorial by the Omaha World-Herald editorial staff conveyed that the r-project should avoid recognized historical sites, specifically referring to sites with historic wagon trail ruts in the Platte River valley.

During these days, there was an audit underway to determine participants associated with the payment of Cherry county funds which might have been associated with initial wind turbine development in Cherry county. The legal auditor was helped by a few county residents.

In association with an expected increase in highway traffic associated with the Nebraska Star Party at Merritt reservoir, a Preserve the Sandhills banner was placed at the gate into the Mcsky Ranch of Mike and Sheila Young on Highway 97 on August 2nd. On the 3rd, it took two hours and about $100 for Mike Young and myself to place two banners on the Young parcel just south of Valentine along the same highway, indicating opposition to turbines as a message from god, for example. Craig Miles - having showed up to talk anti-wind strategy - helped for a bit of time, but was essential in holding up a piece of plywood till is was anchored in place by appropriate size screws. A big change was from using red paint to instead using bright red, reflective tape, which was a good decision as it was much easier to place on the banner. The signs were provided by Cleve Trimble. Additional signage was placed along the Highway 97 route to the event campground.

Request by William Weller to reclassify commercial/utility turbines to an industrial use was presented to zoning board members during the August 7 meeting during the public comment period as it had not been placed on the agenda. The request had been filed on July 19.

Dave Hamilton and Bree DeNaeyer on how the r-project would alleviate risk and discussed economic benefits in an August 14 letter to the editor in North Platte Telegraph. Amy Ballagh wrote a detailed email response indicating multiple "issues" about the letter to the editor.

Cleve Trimble discussed the wind turbine issue in Cherry county including how the commissioners have not taken action on a referendum on the issue. A letter to the editor on August 15 in the Valentine Midland News. Trimble also placed an advertisement about NDDP's abuse of power in regards to the r-project.

Craig Andresen referred to NPPD as a dancing puppet and members of Cherry County Wind as squawking parrots in regards to the r-project as discussed in August 21 letter to the editor in the North Platte Telegraph.

During a series of public hearings held August 21 the Cherry County Commissioners approved only one of eight proposed changes regarding wind turbines. The eight proposals had been previously approved by the county zoning board. The proposed changes were:

This change was approved.
Amendment of zoning regulations of participating property lines (other than right angle corners) to non-participating property line in section 613. This was approved by the two commissioners present.
The following amendments for the zoning regulations were not approved as the vote on each was 1 in favor and 1 not in favor.
* diameter plus applicable building setback to one mile in section 613
* setback of 1/2 mile for non-participating to two-miles for non-participant under the WECS for a dwelling
* diameter plus applicable building setback to three times total tower height
* diameter plus applicable building setbacks to three times total tower height for other rights of way
* diameter plus applicable building setbacks to one mile under the WECS for public conservation areas including wildlife management areas and state recreation areas
* the special safety and design standards on no more than 30 hours per year of shadow flicker to be no WECS shall cast a shadow flicker on any public road
* no commercial/utility WECS shall exceed 50 dba at the nearest structure occupied by humans to no commercial/utility WECS shall exceed 35 dba at nearest non-participating dwelling

There were about 75 people present during the hearings in the Cherry county court room. There is some question if the hearings were legal as there may have been no notification to municipalities within the county.

NPPD indicates they will have to be allowed to trespass on the Brush Creek Ranch south of Thedford to conduct a cultural resource survey. The utility company threatened legal actions so they could gain access associated with the r-project. An attorney for Dan and Barb Welch indicated that any hirelings could not encroach upon the ranch as cattle breeding season was underway and disturbance had to be avoided (August 23 Grant County News 134(4): 1).

Email submitted by Jim Ducey on August 24 to the U.S. Fish and Wildlife Service (Harms and Hines in Nebraska Field office) asking that they require that BSH Kilgore address the following items for the turbine facility proposed southwest of Kilgore.

  1. Require the preparation of an environmental impact study that would evaluate cultural and historical resources, species of concern and other associated details.
  2. Require a review pertaining to the need/no need for an incidental take permit associated with the Whooping Crane. The project site is well within the migratory corridor of this wild bird.
  3. Require a review pertaining to the need/no need for an incidental take permit associated with the American Burying Beetle. There has been a previous report that this species occurs at the project site.
  4. Address any potential concerns associated with the Bald and Golden Eagle Act. Bald eagles are known to nest in the nearby vicinity of the project site.
  5. Address concerns associated with the illegal “taking” of migratory birds as associated with the Migratory Bird Treaty Act; this would include any taking during construction or project operation. What limitations should occur to avoid destruction of bird nests and/or eggs, as well as young. What mitigation efforts should be required for the wild birds and bats that will certainly be killed by spinning turbine blades?
Followup email to FWS sent the first week of October. The email response eventually received during the month said there would be no action by the FWS until the project developer made a particular request for review.

Weekly legislative comment issued August 30 by Sen. Tom Brewer refers to the hiring of a lobbyist by NPPD to promote the r-project; also refers to the Whooping Crane and the need for an incidental take review. Issued in the North Platte Telegraph and other newspapers of the region.

Letter to the editor by Mic and Mel Coffman on how the r-project is a significant threat to the continued existence of the endangered Whooping Crane due to the potential for collisions with the industrial powerline (September 2, 2018; North Platte Telegraph).

Editorial sketch drawn September 4th by Valentine artist in regards to seeming greed of some Cherry county ranchers.

Six-page "press release" titled "Say No to the R-Project Transmission Line!" released September 17th by Dave Hutchinson (Hutchison Organic Ranch, Bassett) discussing scenic values, American Burying Beetle, Whooping Crane and related topics. Document distributed via email.

Letter mailed September 26th to Cherry county commissioners indicating an obvious conflict of interest on their voting on proposed wind turbine facilities or related zoning regulations. Prepared by attorney Jason M. Bruno for Preserve the Sandhills. No obvious response yet in early November.

Jeff Payne, Berlin, PA wrote about the scenic values of the sandhills and how he and his friends enjoy visiting and hunting prairie chickens as they have since 1999. Pointedly indicated his opposition to wind turbines and how they have ruined natural landscapes in the county where he lives (October 3, 2018; letter to editor in Valentine Midland News).

Letter regarding lack of notification for August 21 public hearings sent to Cherry county zoning administrator, county attorney and commissioners by Kilgore, Cody and Nenzel representatives. Letter dated October 12, 2018. The commissioners on October 30 asked county attorney Eric Scott to investigate the situation and determine whether or not letters had been properly sent.

Wildbirds Broadcasting blog post indicated FWS communications associated with the NPPD proposed American Burying Beetle mitigation site near Brewster, Blaine County. Details were received via email on October 17 and dvd on November 1, following an initial FOIA request date of July 30, 2018.

Cherry county Planning and Zoning Board meeting scheduled for November 6 set to address proposed change to section 613 zoning regulations as submitted in February by Wayne Eatinger. This request was tabled until the next meeting.

On December 4th, a decision on the request made by Wayne Eatinger and another by William Weller were both tabled by the Planning and Zoning Board of Cherry County. The Weller request would revise to industrial the "commercial/utility" classification for wind turbines. At this meeting additional testimony was allowed on the Eatinger with additional comments made on the Weller request.

During the month of December, NPPD released an eight-page flyer on the "R-Project - Ensuring Reliable Electricity for Nebraskans" with items on reliable service, restoration, reasons for the powerline routing, delivering reliable energy, Southwest Power Pool, supposed benefits and species and habitat protection.

On December 31 in the Kearney Hub a letter to the editor by Dr. Brent Steffen provided comments on the r-project flyer. His point was that NPPD was ignoring science and the public. Items he addressed included how wind energy development would devastate the sandhills, lack of suitably addressing potential impacts to whooping cranes, misleading presentation of the public meeting process, availability of alternate routes and NPPD acting as a minion of the Southwest Power Pool. This letter was also in the North Platte Telegraph and Grant County News, et al.

2019

Article on January 11, 2019 that NPPD had awarded a construction contract for the r-project transmission line. The amount was for $265 million to Forbes Brothers Timberline Construction. NPPD claimed that the incidental take permit associated with the American Burying Beetle would be received in about three months.

On January 15th both the Wayne Eatinger and William Weller amendments were approved by the Cherry County Planning and Zoning Board. Two map graphics were shown. One indicated how industrial wind turbine placement would have a devastating impact on the county viewscape. The second map indicated vast tract of county property where the owners did not want industrial wind turbines, as well as other indications of pertinent
land categories. This information had not been previously presented to the public.

Comments against the r-project by Judy Rath and indicating the importance of involvement by Nebraska senator Tom Brewer issued in January 21 article in the Lincoln Journal Star.

On January 29th the the recommendations by the Planning and Zoning Board on the Eatinger and Weller amendments was not accepted by the Cherry County Commissioners that voted to return them to the Board. The basis was that supportive information was not provided as required by state law.

Public hearing on Legislative Bill 373 held in Lincoln. The bill, introduced by Sen. Tom Brewer of District 43, would require counties to regulate the placement, noise and decommissioning of industrial wind turbines; for a two year period there would be a 3-mile setback for non participatory residents to allow counties to develop zoning regulations. It was once again boots vs. suits, according to news reports: residents want to prevent destruction of the sandhills while economic development is the mantra of developers.
- - - - -

On February 8th, NPPD issued the final environmental impact statement for the r-project. Documents were provided for a public inspection period, with no comments to be accepted.

In March, Nebraska senator Tom Brewer visited the Department of Interior office in Washington, D.C. to discuss the need for NPPD to do an incidental take review for the Whooping Crane in association with the proposed r-project powerline. Nebraska representative Adrian Smith also attended.

The "Eatinger amendment" for Cherry county zoning regulations was rejected April 30 by county commissioners on the basis that it would be "mob rule" and it would be illegal to completely ban something and perhaps result in the county being sued. The request had been to ban industrial wind turbines more than 80 feet in height. The "Weller amendment" was returned to Planning and Zoning for them to evaluate changing Commercial/Utility to Industrial for wind turbine classification. It was a contentious meeting due to oleaginous behavior of a county commissioner.

"During public testimony James Ducey presented a map which visually depicted the opinions on wind energy development of landowners throughout Cherry County and then when asked by the Board to allow them to create a readable version of that submission Mr. Ducey refused to submit a readable version of the map which had been shown in an open meeting of a public body. The version Mr. Ducey did submit is illegible." County commissioner meeting minutes; May 8, 2019; Valentine Midland News 47(50): 10.

On May 13, 44 Nebraska legislators voted Yea for final approval of LB 155, which addresses the use of eminent domain to construct feeder powerlines for industrial wind turbine facilities and which recognized unique natural features of the sandhills.

During June there were a few letters to the editor on the BSH Kilgore project.

On June 4th Cherry Planning and Zoning voted to recommend approval of CUP for BSH Kilgore project. They voted to approve a "phantom" motion so no actual motion of record was available. It was to be submitted later by a hired consultant who did not do so and then passed away.

Nebraska senator Tom Brewer received notification that NPPD had received incidental take permit that would allow it to build the r-project powerline (letter dated June 20 from the senator's office). The incidental take permit for the American burying beetle was issued June 12th by the U.S. Fish and Wildlife Service.

District court judge Mark Kozisek issues a temporary injunction that would not allow two Cherry County commissioners to vote on the BSH Kilgore CUP application due to potential conflict of interest. Decision made after court action on July 15 in O'Neill where the court room was reportedly packed with people in favor of the injunction.

At the same time a federal suit was filed in Denver against the Fish and Wildlife Service. "The agency, the suit continues, brushed aside potential impacts on historic sites and dismissed threats to endangered whooping cranes and other birds posed by both the power line and the wind farms it would enable." U.S. District Judge Robert E. Blackburn will preside over the suit, filed by the Oregon-California Trails Association, the Western Nebraska Resources Council and the Hanging H and Whitetail Farms ranches between Paxton and Sutherland.

Public hearing on BSH Kilgore CUP application scheduled for July 16 postponed due to temporary injunction imposed by district court judge after a hearing at O'Neill.

Randy Peterson detailed the materials needed to construct a single industrial wind turbine and specifics on transportation requirements in a letter to the editor (July 2, 2019; Valentine Midland News 48(6): 12).

District court judge removed temporary injunction against two Cherry County commissioners regarding potential conflict of interest if voting on BSH Kilgore project (article August 15 in Omaha World-Herald by Reece Ristau). Findings issued August 8th.

Editorial by Omaha World-Herald staff issued August 17th indicating the need for the Nebraska legislature to evaluate conflict of interest concerns defined by law as a result of activities associated with the BSH Kilgore project.

Nebraska senator Tom Brewer and staff left Lincoln to attend the meeting of the Nebraska Game and Parks Commission. He presented information indicating why the agency should rescind a favorable endorsement of approval for the r-project. A primary reason indicated was potential impacts on the endangered Whooping Crane along with details indicating the route approved by the state Power Review Board does not match the final indicated route for the industrial powerline. Further consideration of these matters is to be given at the October meeting of the commission.

On August 30th additional legal action undertaken by Preserve the Sandhills and a Cherry county rancher to address the concern over perceived conflict of interest on county commissioners making decisions to approve an industrial wind turbine project near Kilgore when family members could financially benefit. A hearing in county court was set for September 20.

Letter to editor by Bruce Kennedy, Malcolm, commenting that sandhills should be preserved as a grassland using methods similar to those used in the Flint Hills (September 4, 2019; Valentine Midland News 48(15): 12).

Cherry county commissioners voted October 15th to approve conditional use permit for BSH Kilgore project once 12 specific conditions were suitably met (Grant County News 135(13): 1, 3.)

Center for Biological Diversity files a brief November 14th as a friend of court in lawsuit against U.S. Fish and Wildlife Service regarding the whooping crane and potential impacts if r-project powerline is built. Other parties involved were the International Crane Foundation, American Bird Conservancy and National Audubon Society.

On November 16th a contractor crew for NPPD and the r-project trespassed and destroyed property on the Haake Ranch along the southern edge of Holt county (article November 28, 2019 in Grant County News included details on health threats on Haake place and Welch ranch south of Thedford). NPPD later sent an apologetic letter to Ronald and Marlene Haake and the legislative aide for sen. Brewer met with NPPD to discuss the issue and which included a notice that the legislator would request Nebraska attorney general action if such an event occurred again (December 5, 2019; Grant County News 135(19): 1).

District judge Mark Kozisek ruled November 26th that county commissioners and representatives associated with development of the proposed Kilgore industrial wind turbine facility had to comply with request by Preserve the Sandhills LLC and Charlene Reiser-McCormick asking for discovery regarding actions associated with facility actions (December 5, 2019; Grant County News 135(19): 1). Pertinent information had to be provided by the end of December.

Filing made in Cherry county district court on November 29th requesting that approval of the conditional use permit for the BSH Kilgore industrial wind turbine project be revoked and that commissioners "temporarily and permanently restrain and enjoin the applicants from taking any and all acts upon or in furtherance" of the CUP. There were 90 specific items associated with the filing by Preserve the Sandhills and Charlene Reiser-McCormick versus Cherry County Nebraska, Cherry County board of commissioners, BSH Kilgore LLC, Cherry County Wind LLC, and Bluestem Sandhills LLC (December 12, 2019; Grant County News 135(20): _.

2020

On a 2 to 1 vote Cherry County commissioners approve an extension to October 15, 2024 for the BSH Kilgore conditional use permit. (June 17, 2020; Valentine Midland News 40(4): 6.) The company claimed that legal actions and efforts to obtain aa power agreement with the Southwest Power Pool as the basis for active work necessary to keep the CUP application active.

Incidental take permit for American burying beetle associated with the R-Project revoked by a federal court judge on June 17th. Reasons given for the revocation were the following as indicated in the court filing.

“Having bushwhacked for weeks through this thicket, the Court finds, for the reasons explained below, that a large number of Petitioners’ challenges are without merit. The Court agrees with Petitioners, however, as to the following:
“* the Service inadequately considered the effects of the R-Project on the O’Fallon’s Bluff segment of the Oregon and California Trail;
“* the Service unlawfully excluded potential wind turbine development in Antelope County, Nebraska, from its analysis (an error which infects various other analyses under the ESA, NEPA, and the NHPA); and
“* one portion of a “programmatic agreement” entered into to address NHPA matters is arbitrary and capricious, at least on this record.
“As a consequence, the Court will set aside the Service’s decision to grant the June 12, 2019 incidental take permit, meaning said permit will be vacated.”

27 November 2018

Eatinger Amendment Public Hearing Held at Valentine

November 15, 2018. Grant County News 134(16): 1, 5.

A decision on a submitted amendment that would prohibit industrial wind turbines in Cherry county was tabled at the November 6 meeting by the Planning and Zoning Board. Any decision will occur at its next meeting.

The amendment submitted in February, 2018 would repeal section 613 clauses in the county zoning regulations and replace them with language indicating that only personal use turbines of 80 feet or a lesser height would be allowed in Cherry County.

Rancher Wayne Eatinger explained his reasons for filing the amendment at the start of the public hearing, indicating why the change was necessary. He also submitted several documents prepared as testimony for the public hearing held November 6th, including commentary that would be discussed later by others.

Twenty people testified in support of the amendment including Le Roy and Carolyn Semin of Kilgore, Mike Young, Wanda Simonson representing her family, Gary and Glenda Phipps from north of Whitman, Craig Miles at Brownlee, Rick Weber, Sherri Bacon, golf aficionado Cleve Trimble and young rancher Brock Moreland who had to hurriedly leave behind chores at the ranch near Merriman to get to the hearing.

Dave Hamilton was the only one that spoke against the amendment.

Proponents of the amendment to prohibit industrial wind turbines referred to common themes that have been regularly discussed at several previous public hearings. These topics included: preserving the unique values of the sandhills including its notable viewscapes and life-style features so appreciated and important to residents and their friends and so many others including a regular multitude of visitors, avoiding impacts on tourism and recreation, negative impacts of turbine noise, loss of property value, negatives of turbine flicker, decommissioning of no longer useful turbines, loss of dark skies, “red-light” districts where the aircraft flight warning lights atop turbines would blink incessantly, threats to the endangered Whooping Crane and other wild birds of conservation concern, potential threats to groundwater quality, etc.

A common theme was that the Sand Hills are superb cattle country and should remain that way. There were many heartfelt words shared by some speakers as they shared experiences of people that have experienced negative impacts associated with industrial turbine facilities when the structures became prevalent to their place in the country in other states.

A few minutes of the hearing need to be especially appreciated and recognized. Bob Stetter has decades of life experiences in the sandhills. He waited until nearly the end of the hearing to speak. While sitting at the long end of the courtroom bench, when someone else would get up to speak, he sat down and patiently waited for the right time, which was an iconic moment in the courtroom. He slowly walked past other fine folks seated on the bench to his left to get to the desk where he would speak. After some more moments he slowly wrote his name twice on a page provided so there would be an officialist’s list of those giving testimony. Cattleman Bob sat in a hard wooden chair in front of the microphone and spoke significant words why there should be no wind turbines in the Sandhills. He said he would never take any amount of money in the world for turbines on any property he ever owned. Everyone was listening but there were no comments on one obvious misspoken word. There were a lot of busy eyes, because everyone realized the slip, but kept silent as it was very soon self-corrected. Details he presented were spot-on. These were Bob’s true words: “Cherry County is cattle country and not a place for industrial wind turbines.” His commentary was carefully typed and he read most of its details. One zoning board member tried to stop him from speaking because he had exceeded the five minute speaking limit, but the distinctive words continued for a short time. Upon conclusion, board members were given a copy of his written comments. Stetter has been a stalwart activist against wind turbines at many public hearings at Valentine.

The single opponent to the amendment touted supposed economic benefits and that turbines are a changing paradigm and need to be allowed. This speaker stated that the referendum was a “stalling tactic” by people “clinging to the past.”

There were at least 75 people attending the hearing, and when one speaker asked that those in favor of the amendment to prevent wind turbines stand to indicate their view, everyone stood except for three people associated with the turbine facility development company or the local group promoting turbines.

Those attending were predominantly ranchers from all sections of Cherry county and spoke with authority and knowledge. They also provided ample documentary proof, so obviously they had been doing much more than ranch chores. Some of the speakers indicated how industrial wind turbines could be a threat to their livelihood.

The hearing lasted from 4:30 p.m. until 6:10 p.m. Everyone that wanted to speak was allowed five minutes to present their testimony.

Following the hearing, and during subsequent board discussion, member Gary Swanson posed the situation as being two conflicting visions for the county. “Someone wants to impose their will on somebody else.”

One future would mean no turbines in the county. The alternative would result in wind turbine facilities and associated industrial powerlines crossing the land.

Another concern discussed by the board is the difficulty of getting enough members to attend meetings to make certain there is the required quorum, such as the five members present on the 6th. There are currently two vacancies. It was expressed that hopefully more members could be present at the next meeting scheduled for December 4th.

Following any decision on the Eatinger amendment by the Planning and Zoning Board, their recommendation will be submitted to the county commissioners for their yes or no vote after another public hearing.

At the pending December meeting there is an expected public hearing on the William Weller amendment requested a change in zoning regulations. Language which currently indicates commercial/utility grade wind energy conversion systems would be revised to industrial grade wind energy conversion systems. This amendment was submitted July 19, 2018.

The Eatinger amendment public hearing was held at the Cherry County courtroom along north Main Street, Valentine.

23 July 2018

Request Filed to Classify Wind Turbines as an Industrial Feature in Cherry County

A request to amend the Cherry County, Nebraska, zoning regulations was filed July 19, 2018 to revise the designation associated with wind turbines. The request was to change the regulations so wind turbines are an industrial feature, rather than the currently classification as “commercial/utility”. An additional request was to have industrial wind turbines specifically indicated as an industrial use as referenced by section 303 of the county regulations.

The request was filed by Cherry County landowner William R. Weller – whose property adjoins many parcels owned by a land-owner who has signed an agreement to allow wind turbine placement on their property. Mr. Weller also paid the $50 filing fee early in the morning on July 19 at the county offices. A two-page attachment was included in the filing, indicating where changes in the regulatory text were being requested, mostly associated with section 613 of the zoning regulations.

When the was submitted to the county zoning administrator, a request was made that the item be placed on the agenda for the August 7th Planning and Zoning Board meeting to indicate a specific date and time for a public hearing and an active public consideration of this proposal.

This is the request filed with the zoning administrator by Mr. Weller.

Request for Revisions to the Cherry County Zoning Regulations

July 19, 2018; changes are indicated by bold text. This online document has been slightly changed for formatting purposes, but there were no substantive changes in content.

303.42 INDUSTRIAL USE: Of, relating to, concerning, or arising from the assembling, fabrication, finishing, manufacturing, packaging, or processing of goods, or mineral extraction.

Revise to:

303.42 INDUSTRIAL USE: Of, relating to, concerning, or arising from the assembling, fabrication, finishing, manufacturing, packaging, or processing of goods, mineral extraction or any WECS with a wind turbine(s) height above ground exceeding 100 feet.

SECTION 613 WIND ENERGY CONVERSION FACILITIES

613.03 Commercial/Utility Grade Wind Energy Systems

Revise to: 613.03 Industrial Grade Wind Energy Systems

Purpose: It is the purpose of this regulation to promote the safe, effective and efficient use of commercial/utility grade wind energy systems within Cherry County.

Revise to:

It is the purpose of this regulation to promote the safe, effective and efficient use of industrial grade wind energy systems within Cherry County.

Definitions

2. Commercial/Utility WECS shall mean a wind energy conversion system of equal to or greater than 100 kilowatts in total name plate generating capacity.

Revise to:

2. Industrial WECS shall mean a wind energy conversion system of equal to or greater than 100 kilowatts in total name plate generating capacity.

Requirements

Commercial/Utility Grade wind energy systems shall be permitted as a Conditional Use within any district where...

Revise to:

Industrial Grade wind energy systems shall be permitted as a Conditional Use within any district where...

Table on Setbacks; column title

WE-CS Wind Turbine Commercial/Utility WECS

Revise to: Wind Turbine Industrial WECS

Special Safety and Design Standards

All towers shall adhere to the following safety and design standards:

Section 1. The Commercial/Utility WECS owner(s) and/or operator(s) shall conduct an analysis on potential shadow flicker at any occupied...

Revise to:

The industrial WECS owner(s) and/or operator(s) shall conduct an analysis on potential shadow flicker at any occupied...

Section 3. All Commercial/Utility WECS shall have a sign or signs posted on the tower, transformer and substation

Revise to:

3. All industrial WECS shall have a sign or signs posted on the tower, transformer and substation...

4. All wind turbines, which are a part of a commercial/utility WECS, shall be installed with a tubular, monopole type tower.

Revise to:

All wind turbines, which are a part of an industrial WECS, shall be installed with a tubular, monopole type tower.

6. Color and finish:

All wind turbines and towers that are part of a commercial/utility WECS shall be white, grey, or another non-obtrusive color. Blade finishes shall be matte or non-reflective.

Revise to:

6. Color and finish:

All wind turbines and towers that are part of an industrial WECS shall be white, grey, or another non-obtrusive color. Blade finishes shall be matte or non-reflective.

12. ... each Commercial/Utility WECS shall have a Decommissioning plan...

Revise to: 12. ... each industrial WECS shall have a Decommissioning plan...

13. Noise:

No Commercial/Utility WECS shall exceed 50 dBA at the nearest structure occupied by humans.

Exception: a Commercial/Utility WECS may exceed 50 dBA during periods of severe weather as defined by the US Weather Service.

Revise to:

No industrial WECS shall exceed 50 dBA at the nearest structure occupied by humans.

Exception: an industrial WECS may exceed 50 dBA during periods of severe weather as defined by the US Weather Service.

10 May 2018

Wildbirds Die Due to Collisions With Spinning Blades of Wind Turbines


Wildbirds Die Due to Collisions With Spinning Blades of Industrial Wind Turbines

Wind Turbine Facilities Destroy Distinct Habitat Essential for Wildbirds

Industrial wind turbines should not be built in Cherry County, a land internationally recognized as a haven for hundreds of species of appreciated and vital wildbirds and many other sorts of fauna and flora, as based upon decades of scientific records and efforts of so many appreciative people

Elect a county commissioner candidate that will say no to industrial wind turbines in Cherry County and prevent the destruction of habitats where wildbirds thrive

My vote will be for two leaders, Michael C. Young and James B. Ward who have publicly stated they would just say NO to industrial wind turbines

Paid for by James E. Ducey, Valentine; a birder that has traveled throughout the Great American Sand Hills since 1982 to learn about wildbirds, and which has resulted in an appreciation of the many important natural resources in the regions. These assets need to be recognized now so they can be present for future generations.

May 9, 2018. [Wildbirds die due to collisions with spinning blades of wind turbines.] Valentine Midland News 46(45): 11. A paid advertisement. The cost was $108.


18 July 2017

NPPD Forces Feds to Nix Attendance of FWS Official at Community Meeting

A phone call from a federal office in Washington D.C. prevented Robert Harms of the U.S. Fish and Wildlife Service from attending a private meeting in Thedford on the afternoon of July 17, 2017.

Officials of the Nebraska Public Power District had learned of the meeting via an online posting, and called the Denver and Grand Island office of the federal agency, but were told by an agency head in Nebraska that the question and answer meeting was still a go, according to details provided by a meeting sponsor. Because of communication with an office in Washington, D.C., Harms received notice that he could not attend the meeting. It was conveyed that NPPD thought that it looked like Harms was “going behind their back” and made the FWS look biased.

Harms, from the Nebraska Field Office, had planned to answer questions regarding the R-Project. He was already in Thedford, when he received the notification to not attend, within the hour prior to the start of the meeting.

Prior to the start of the meeting, two NPPD representatives were sitting in a back corner of the meeting room of the venue. They were kindly asked to leave, initially balked as they were told to attend by some lawyer and then erroneously said that Mr. Harms would be present. Once told that it was a private meeting and they did not have reservations, they were escorted to the exit and it was made certain that they left, according to the hostess of the meeting. While the meeting was underway, an attendee that arrived a short time after it had started, saw two people in an NPPD truck driving around, taking pictures of parked vehicles and their license plates, she said.

Ranchland Community Gathering

Despite the lack of a guest that would have been greatly appreciated, the meeting continued with discussions on these key items:
* the Section 404 application made to the Army Corps of Engineers where NPPD has asked for a type of permit which does not address fill being placed in wetlands for the required long-term powerline and power-pole maintenance; they have also requested a permit that was prepared in a manner that would not allow public review, as associated with an individual permit. Information on this application was received three Freedom of Information Act requests. Any decision is still pending.
* change in r-project alignment: the alignment map in the ACE document does not match the alignment indicated in other draft documents that have recently been submitted for public review; there are obvious substantive changes.
* lack of legal agreements for many portions of the proposed powerline route as obvious due to the few easements filed in deed records of two counties which the powerline will traverse, notably Blaine county.
* NPPD and regulatory agencies undertaking an environmental review and other considerations for a project where the final route of the powerline is hypothetical due to the lack of legally-indicated easements.
* how is it that NPPD can identify itself as a “quasi-public” corporation; this company has even indicated that it is a public corporation or a political subdivision, according to documentation received via the FOIA request; an action item indicated at the meeting was to have the Nebraska Attorney General issue a finding that will provide a final answer as to the type of company designation for NPPD. It is impossible for NPPD to be a "political subdivision" as the term is applicable to incorporated villages, towns and cities.
* pending opportunity for further public comment on the draft environmental impact statement and other project documents, comprising about 1500 pages; additional weeks will be provided, based upon details which are expected to be issued this month in the Federal Register.
* matters regarding the legal statutes of the state of Nebraska Open Meetings Act, including how these statutes have recently been violated in association with public meetings on the r-project and wind turbine planning efforts in Cherry county.
* plans for ongoing activities to keep industrial powerlines and unwanted wind turbines from being placed in the sandhills, a place that is special for each person in the meeting, and for future generations, as stated multiple times by speakers. Cattleman Steve Moreland from Merriman put it very succinctly: “Just say no” to unwanted turbines and powerlines.

The private meeting was hosted by Dan and Barb Welch of the Brush Creek Ranch which is primarily west of Brownlee, with their south unit a short distance south of Thedford, along with great involvement from "members" of the advocacy group “Preserve the Sandhills.” More than 65 people attended, including Merriman, Valentine, Wood Lake, the Brownlee area, Brewster, Burwell, and Thomas County residents. There was also a representative or two from local planning boards or county commissioners that attended to hear the commentary.

There were many successful ranchers present, sitting on the chairs in the rooms. Their names could be mentioned individually, but that will not happen here because it was a community meeting where a bunch of special ranch country decided to splice out personal time during a busy summer season to be present at a meeting for common causes.

Lots of cowboys hats were upon the heads of cattlemen. There were boots a bit of distance above the floor spread about. The crowd was completely respectful. They listened. They learned because among those present are a few people which have spent multiple hours dealing with government, wind turbines and an industrial powerline. Most importantly, everyone, yes everyone was given a chance to speak. Everyone listened attentively in each instance.

The meeting was one more example of sand hill ranchland residents gathering to work towards conservation of their home place now as well as for their future generations.

Blaine county is now initiating efforts to develop zoning regulations, according to comments made at the meeting and details mentioned at the meeting of the Cherry county commissioners on July 11th. An initial meeting is pending.

24 April 2017

Governor Ricketts Speaks About Wind Turbines at Community Meeting

When Governor Pete Ricketts held a community meeting at Valentine, there were three questions asked that dealt with wind turbines: 1). What was his position on the placement of turbines within the sandhills and if he was to make any decisions on turbines, how could Cherry county residents know that these would be made without bias; 2) what was his view on legislative bill 504 as introduced by senator Tom Brewer; and, 3) what taxes will be paid on wind turbine facilities.

The governor indicated that “zoning needs to be done locally” and that local residents should work on the issue and decide the rules. In regards to the R-Project, he said that this transmission line has nothing to do with wind turbines, but is instead a “duplicate path for power transmission.”

Specifically mentioned was the necessity for the Omaha Public Power District to provide a renewable energy source for the new Facebook facility to be built in eastern Nebraska. This was a “demand” made by the corporation to build their facility in the state.

Ricketts said he has not considered LB 504 in any detail. He did suggest that there may be alternatives to address the study portion of the legislative bill, perhaps through a university study. The governor indicated that property and sales taxes would be paid, however, the person that asked the question did not accept the answer as he was heard later stating that he would visit with county officials to get the particulars.

After the formal meeting, Twyla Witt discussed wind turbine aspects with the governor. One comment conveyed is that the r-project will be used to promote construction of turbine facilities, as the line will provide a means for energy transportation. Also mentioned was that a lot of people are not happy about the possibility to have turbines in the sandhills. Two other items Witt mentioned were the impact that turbines could have on a unique landscape and how that may influence tourism, and the situation with the conflict-of-interests associated with the Cherry county commissioners.

One attendee was a member of the board of the Bureau of Educational Lands and Funds. Subsequent to a decision by this agency to place turbines on property they manage, he indicated that details learned since this initial decision convey that the approval may not have been the proper choice.

About 25 people attended the Valentine meeting during the late afternoon on April 18th; present were Cherry county commissioners Tanya Storer (who introduced the governor) and Martin DeNaeyer, Mayor Kyle Argenbright and local print and radio media. Several wind turbine proponents and opponents were also present. The governor’s next stop was North Platte.

Study on Prairie-Chicken Leks and Wind Turbines is Deficient

[Revised May 1, 2017.]

Results of the recently published study on the behavior of Greater Prairie-Chicken behavior are interesting but nearly useless in any consideration of how wind turbine activity has any influence on these prairie grouse. A goal of the study was to investigate activities of male Greater Prairie-Chicken in association with the wind turbine facility south of Ainsworth, operated by the Nebraska Public Power District and where there are 36 turbines.

Upon careful, detailed and repeated reading of the study results, and a consideration of tabular results, there is an aspect which is completely missing. The methods do not convey any effort to associate operational turbine activity and the resultant noise in any sort of association with the behavior of male prairie chickens.

The researchers indicate in their abstract that the potential for “low-frequency noise” caused by operational wind turbines may disrupt acoustic communication and thus behavior meant a prediction that males close to wind turbine facilities would spend more time in “agnostic behavior.” The researchers use details from the findings of other studies to make these two inferences.

Note that observations were made early in the morning, a time of the day when wind levels are most typically at the daily minimum; i.e., when turbine blades would most likely not be operating and thus there would be no turbine noise present. The researchers even indicate that “average daily wind speed” was not considered further in the “modeling process” despite having been measured during lek surveys.

There are no results associated with prairie-chicken behavior in association with turbine noise indicated in the research results. Nowhere within the published article is there any comparison of male lek behavior correlated with the noise levels made by operational turbines. The study suggests that “noise disturbance may affect the leking behavior of male greater prairie-chickens through two mechanisms.” Those are indicated to be low-frequency noise produced by operating wind turbines and how noise associated with operational wind turbines might influence behavior by male chickens at a lek.

It is quite obvious that the research results are proper but wholly inadequate.

Opinions indicated in the latter portion of this supposedly accurate article are nothing more than an opinion. Consider this item from the article: “Our results suggest that potential noise disturbance at the wind energy facility (i.e., turbine noise) did not disrupt acoustic communication to the level that the disturbance affected behavioral interactions." The next sentence in the peer-reviewed article uses the words "may suggest" which is basically an opinion. The next paragraph even infers that “results suggest that potential noise disturbance at the wind energy facility did not disrupt female lek attendance.”

It needs to be strongly emphasized that the researchers provide not a single source of information to correlate prairie-chicken behavior and noise levels from operational wind turbines.

Another statement is indicative of how fact is mixed with fictional opinions by the authors of this supposedly authoritative research article: "...our results suggest that birds close at leks close to the wind energy facility may obtain fitness benefits." This is another example of hyperbole, as “suggest” is not based upon fact but is nothing more than an opinion being conveyed, as there are no measured details presented on the physical condition of the prairie chickens at the leks studied.

There were no results indicated that when male chickens partake in display behaviors, and that their incessant action as a result of wind turbine activities may result in a lesser degree of physical fitness? It is well known that incessant behaviors are not healthy, and in the case of prairie-chickens, there may be a reduced physical fitness because of the being so constantly involved in breeding sorts of activities, as indicated in the research article.

The results are indicative of prairie-chicken occurrence in association with inert wind turbines, not actively operating wind turbines. For researchers to use a flawed research protocol to convey findings is simply not acceptable. At least the paper indicates that further studies are needed. A particular focus is the need to correlate behavior with measures of turbine noise levels.

This is a fine study of Greater Prairie-Chicken behavior, but there is no basis in fact on how operational wind turbines influence the behavior of these prairie grouse. The title of the article is accurate but misleading as findings are based upon distance from a wind turbine, not the distance from an operational wind turbine.

At least the paper indicates that further studies are needed. A particular focus is the need to correlate behavior with measures of turbine noise levels. This paper is interesting but its findings contain too many opinions – i.e., flaws in research design - for it to be used in any manner associated with an operational wind turbine facility in the Nebraska Sand Hills.

Citation: Indirect effects of an existing wind energy facility on lekking behavior of Greater Prairie-Chickens. Ethnology 122(2016): 419-429.

This article notably did not include the following significant article, which is another strike against the researchers. Other “Literature Cited” referred to birds other than prairie grouse.

Findings of Effects on Grassland Birds

A long-term and very essential study that needs to be considered is “Effects of wind-energy facilities on breeding grassland bird distributions” as published by Jill A. Shaffer and Deborah A. Buhl in 2015 in Conservation Biology, Volume 30, No. 1, 59–71. Work was done by scientists associated with the U.S. Geological Service. This is a portion of the abstract: “During 2003–2012, we monitored changes in bird density in 3 study areas in North Dakota and South Dakota (U.S.A.). We examined whether displacement or attraction occurred 1 year after construction (immediate effect) and the average displacement or attraction 2–5 years after construction (delayed effect). We tested for these effects overall and within distance bands of 100, 200, 300, and >300 m from turbines. We observed displacement for 7 of 9 species.”

Species studied included the Grasshopper Sparrow, Western Meadowlark, Upland Sandpiper and Killdeer which occur in upland grassland habitat of the Sandhills of Nebraska. Bobolink were also mentioned though they occur in lowland meadows which are not typical places where wind turbines could be placed.


09 March 2017

Hearing Held on Moratorium on Turbines in the Sandhills

It was country boots versus city suits during the hearing on legislative bill 504 at the Nebraska state capitol on March 1st.

The natural resources committee held a hearing on a bill introduced by senator Tom Brewer, who represents the 43rd district. The legislation would establish a two-year moratorium on development of industrial wind turbines within the sandhills, and that a study of wind turbines impacts or influences occur during this period.

Senator Brewer opened the hearing. The primary reason for the moratorium would be to have a “time-out” to “give everyone a voice and a chance to be heard.” Turbine proposals, especially in Cherry county have been obviously contentious, resulting in families divided and friend and neighbor disagreements. Tax subsidies were also mentioned as developers are rushing to build before the end of federal tax subsidies in a few years. There is a need to balance the rights of wind companies with those of land owners and other interested parties, he said.

Proponents urging that the bill be moved out of the committee for consideration by the full legislature were primarily ranchland residents, with many having a personal stake in what will happen within the sandhills if turbine facilities and associated power lines get built.

There were Cherry county ranchers from the Goose Creek country and the Brownlee vicinity. Others also drove hundreds of miles from the Thedford area. A ranchwife from north of Burwell came to express her concern about turbines and the tactics of the Nebraska Public Power District associated with the construction of the proposed R-Project industrial power line. Other concerned citizens came from Valentine, Wood Lake and Taylor, as well as a former state senator from North Platte, from a ranch dating to 1878.

These many people took time out of their schedule – during the busy calving season – to drive many miles to Lincoln because of what they and many others appreciate about the Sand Hills. It is a common consensus that the region is cattle country, not wind turbine country. A common theme was that the sandhills are a unique place that deserves special protection.

There was a comment about the region being a “national natural wonder” and a “magical and amazing place.” Ann Manning-Warren, drove from the Goose creek country of southeast Cherry county. She said “there is no other place in the world quite like the sandhills.” Her ranch, like many others, represent generations of ranch families that have conserved the grassland range and other unique land features.

Fourth generation rancher Craig Miles said the positions on wind turbine facility development was the “difference between cowboys and paid suits.” His testimony conveyed a sense of place from prominent landmark, Hackberry Point, where the view towards the North Loup River, the wind among the grass and the sound of the wild birds can be enjoyed. The “wisdom behind LB 504 is taking the high road.”

Also present was a spokesman for the Lincoln-based Wachiska chapter of the National Audubon Society, a group that has for many years worked to conserve tracts of tall-grass prairie in southeast Nebraska. Bruce Kennedy has also been involved in getting the Niobrara River designated as a national scenic river.

The Nebraska Sierra Club spokesman George Cunningham said that though the group are proponents of “sustainable alternative energy systems” there is “no need for energy developments in native grasslands.” They should be on converted land.

The massive development of wind turbine facilities in Antelope county was indicated by Dean Smith, a farmer from near Brunswick. He indicated that 50% of the county has easements that allow wind turbine placement, with about one-half of that property owners being absentee landowners. There are already 220 industrial turbines within the county, with another 168 proposed. His three primary concerns are viewscape, timely collection of taxes and wind turbine syndrome. A tactic used by developers is that once there is one turbine, why not put in others, he said.

Developers are now intent on placing industrial development on land in the vicinity of ranches cared for by multiple generations of families. Within Cherry county, there is the Kilgore project and the newly identified Cascade project that would place 147 turbines on land along the Cherry county line, north of Thedford along Highway 83.

Opponents were most notably represented by lawyers and lobbyists for wind energy development companies. The men in suits were paid to talk.

They included someone from Berkshire-Hathaway Energy, or was it BSH Renewables, the current owner and operator of the Grande Prairie turbine facility in northern Holt county. This company is looking for additional opportunities to purchase wind turbine developments. The Sand Hills is one of their top three locales for future development, lawyer Alan Butler said.

Invenergy, the developer of turbine facilities in Boone and Antelope counties, had representative Joshua Framel proclaim that their projects “maximize benefits with minimal impacts.”

A lawyer from an Omaha law firm said the legislation is “unwarranted and will dangerously chill opportunities for wind development in Nebraska.” Mike Degan also said that there is an advantage to placing turbines in the sandhills because there is “less residential development so turbines could be placed in remote areas.”

Also speaking in opposition to LB 504 was Kathy Torpy of The Nature Conservancy. This group is pro-wind and wants more turbines in Nebraska, and she asked for “thoughtful and well done placement of turbines” with a request for meetings to be held within the sandhills on this issue. She also said that “ecologically sensitive areas” need to be protected and asked – for some reason not indicated – that the Nebraska Game and Parks Commission lead the study.

The Center for Rural Affairs was also opposed to the legislative bill, since it was “focused on removal of local communities to regulate wind turbines.” Spokesman Lucas Nelsen also said that the boundary indicated with the legislative bill needs further consideration.

Bree DeNaeyer secretary of Cherry County Wind, L.L.C. also spoke, stating the need to “dispense with 504.” Her husband is a county commissioner operating a ranch on land owned by his mother, an enrolled member of the group. Her opinion was that the state legislation would conflict with local zoning regulations and impinge on private property rights. Rancher Dave Hamilton, also an enrolled member of Cherry County Wind, said wind turbines would mean economic development that would “ripple down main streets” and the bill was a “stall tactic.”

Bluestem Energy Solutions, an Omaha-based company, was well represented. They have plans – one which was rejected by the Cherry county commissioners – for a turbine facility south of Kilgore, and the Cascade project along Highway 83 at the Cherry county line, north of Thedford.

Testimony was also expressed by a wind coalition lobbyist that works to remove barriers to wind development wherever.

Other groups opposed to the bill were the Saline County Wind Association (comes down to the not in my backyard opinion), the Nebraska League of Conservation Voters (wind is a resource that needs to be taken advantage of, just like land and water), the Nebraska Chamber of Commerce and Nebraska Farmer’s Union (the bill is “heavy-handed” and anti-business, anti-property rights and anti-local control).

There were also two speakers with a neutral position. Ken Winston of Bold Alliance asked that amendments be added to the bill to address pipelines, injection wells and powerlines. A representative of the Nebraska Association of County Officials also spoke.

Everyone had a chance to present their representative testimony, with nearly every speaker limited to three minutes. Letters that had been sent in were also indicated.

Sen. Brewer indicated his view upon making comments at the end of the hearing. “This is an issue that effects many. Bring this legislation to the floor … to let the committee decide is ridiculous. Counties don’t know what will be right or what will be wrong.” He noted how some wind energy developers “put a gun to our head” as they said “give us wind or we will go elsewhere.” This threat was not acceptable to Sen. Brewer, who also said it was “wrong-headed and ridiculous to bring in turbines because there are already roads and railroad tracks.”

According to the clerk of the hearing committee, there were 23 people that testified in favor of the legislation, with 40 letters received that indicated the same view. Opponents were represented by 16 speakers, with 20 letters received.